Operations & Traceability / Other
Remaining Operations & Traceability endpoints.
📄️ List working places (FR-OPS-008 register)
List working places (FR-OPS-008 register)
📄️ Get full hierarchy tree for all sites
Get full hierarchy tree for all sites
📄️ Get full hierarchy tree for a site
Get full hierarchy tree for a site
📄️ Get production variance summary for dashboard period
Get production variance summary for dashboard period
📄️ Per-zone production summary with achievement vs target (RED/AMBER/GREEN)
Per-zone production summary with achievement vs target (RED/AMBER/GREEN)
📄️ Most-recent night-shift production summary by zone
Most-recent night-shift production summary by zone
📄️ FR-OPS-011 — Weekly production rollup feeding Section B.
FR-OPS-011 — Weekly production rollup feeding Section B.
📄️ FR-OPS-014 — Real-time variance vs. configured targets.
FR-OPS-014 — Real-time variance vs. configured targets.
📄️ Deprecated: use POST shift-logs with logType=BLASTING
Deprecated: use POST shift-logs with logType=BLASTING
📄️ The tenant approval policy in force
Lets the web transfer dialog warn, before submitting, that a transfer will be held for signature.
📄️ FR-CRYPTO-030 — Integrity Verification Report (totals + hash + signature + chain stats).
FR-CRYPTO-030 — Integrity Verification Report (totals + hash + signature + chain stats).
📄️ FR-CRYPTO-031 — Download a signed, hash-stamped PDF of the Integrity Report.
FR-CRYPTO-031 — Download a signed, hash-stamped PDF of the Integrity Report.
📄️ Weekly development summary (plan vs actual, workplace breakdown, shift variance, working days)
Weekly development summary (plan vs actual, workplace breakdown, shift variance, working days)
📄️ Weekly blasting summary (holes per type, misfire counts, lost-blast breakdown, efficiency)
Weekly blasting summary (holes per type, misfire counts, lost-blast breakdown, efficiency)
📄️ Equipment utilization rate (FR-EQUIP-002) per shift / per tunnel
Equipment utilization rate (FR-EQUIP-002) per shift / per tunnel
📄️ Weekly equipment summary (rollup, breakdowns, lamps reconciliation)
Weekly equipment summary (rollup, breakdowns, lamps reconciliation)
📄️ Weekly material variance summary (FR-EQUIP-004)
Weekly material variance summary (FR-EQUIP-004)